| dc.creator |
ÖZÇELİK, Mehmet |
|
| dc.date |
2017-12-31T21:00:00Z |
|
| dc.date.accessioned |
2020-10-06T09:24:38Z |
|
| dc.date.available |
2020-10-06T09:24:38Z |
|
| dc.identifier |
0ce8c65b-ce7a-4899-9b8d-a785291faf1f |
|
| dc.identifier |
10.15407/mining12.03.080 |
|
| dc.identifier |
https://avesis.sdu.edu.tr/publication/details/0ce8c65b-ce7a-4899-9b8d-a785291faf1f/oai |
|
| dc.identifier.uri |
http://acikerisim.sdu.edu.tr/xmlui/handle/123456789/53148 |
|
| dc.description |
Purpose. This study was conducted to determine the amount of energy and water consumption in the production of aggregates for a certain period of time and also calculated the parameters that effect energy consumption in natural aggregate processing. |
|
| dc.language |
eng |
|
| dc.rights |
info:eu-repo/semantics/closedAccess |
|
| dc.title |
ENERGY CONSUMPTION ANALYSIS FOR NATURAL AGGREGATE PROCESSING AND ITS RESULTS (ATABEY, ISPARTA, TURKEY) |
|
| dc.type |
info:eu-repo/semantics/article |
|