| dc.creator |
ÖZDEMİR, Gültekin |
|
| dc.creator |
CAYIRLI, Muhammed |
|
| dc.creator |
KORUCA, Halil İbrahim |
|
| dc.creator |
AYDEMİR, Erdal |
|
| dc.date |
2010-11-30T22:00:00Z |
|
| dc.date.accessioned |
2020-10-06T10:33:09Z |
|
| dc.date.available |
2020-10-06T10:33:09Z |
|
| dc.identifier |
7a2caade-5f4d-4b00-be5e-a69134973c17 |
|
| dc.identifier |
10.1016/j.eswa.2010.05.065 |
|
| dc.identifier |
https://avesis.sdu.edu.tr/publication/details/7a2caade-5f4d-4b00-be5e-a69134973c17/oai |
|
| dc.identifier.uri |
http://acikerisim.sdu.edu.tr/xmlui/handle/123456789/64079 |
|
| dc.description |
It is possible to evaluate production system performance measurement and organizational alternative structures with dynamic simulation methods for efficiency of cost and productivity. The parameters which are vary for different organizational structures and scope of production systems are examined in a mutual simulation-based performance measurement system. In general, the simulation-based performance measurement criteria are lead time, lead time deviation, utilization rate, and work-in-process as goal achievements of logistics and delivery rate in performance evaluation module. |
|
| dc.language |
eng |
|
| dc.rights |
info:eu-repo/semantics/closedAccess |
|
| dc.title |
The simulation-based performance measurement in an evaluation module for Faborg-Sim simulation software |
|
| dc.type |
info:eu-repo/semantics/article |
|