DSpace Repository

Examination of uncertainties and risk sources in Dudullu-Bostanci (Istanbul) Metro construction

Show simple item record

dc.creator ÖZÇELİK, MEHMET
dc.date 2020-05-01T00:00:00Z
dc.date.accessioned 2021-12-03T11:28:40Z
dc.date.available 2021-12-03T11:28:40Z
dc.identifier 51dc8e59-7ff2-4c56-8e4e-67c83896b538
dc.identifier 10.1007/s12517-020-05400-z
dc.identifier https://avesis.sdu.edu.tr/publication/details/51dc8e59-7ff2-4c56-8e4e-67c83896b538/oai
dc.identifier.uri http://acikerisim.sdu.edu.tr/xmlui/handle/123456789/91793
dc.description Uncertainties in tunnel projects show differences from other engineering projects due to their high variability in geological, hydrogeological, seismic, and geotechnical properties. Engineering geology, geophysical, and geotechnical parameters are needed to minimize these uncertainties. Construction of the Dudullu-Bostanci Metro is being carried out in the Asian section of Istanbul, which passes under the densely populated area from north to south. Earth pressure machines (EPB-TBMs) with a diameter of 6.57 m involve the construction of 14.3 km of Dudullu-Bostanci underground metro line and its 13 stations at an average depth of approximately 30 m. Increasing priority is given to large-scale engineering projects, such as tunnels, where uncertainty is a major risk factor. The aim of this study is to examine the uncertainties and risk sources in Dudullu-Bostanci Metro Line. As a result of uncertainty and risk assessments, tunneling with EPB-TBM method is applied in tunnel excavation, which is determined as the most appropriate method.
dc.language eng
dc.rights info:eu-repo/semantics/closedAccess
dc.title Examination of uncertainties and risk sources in Dudullu-Bostanci (Istanbul) Metro construction
dc.type info:eu-repo/semantics/article


Files in this item

Files Size Format View

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account