DSpace Repository

Plaster Stemming Application at a Basalt Quarry: a Case Study

Show simple item record

dc.creator Cevizci, H.
dc.creator Tosun, Y.
dc.creator Caran, S.
dc.creator Yavuz, H.
dc.date 2015-01-01T01:00:00Z
dc.date.accessioned 2021-12-03T12:05:28Z
dc.date.available 2021-12-03T12:05:28Z
dc.identifier f9acf856-28d0-41c3-bc52-65c23ba93632
dc.identifier https://avesis.sdu.edu.tr/publication/details/f9acf856-28d0-41c3-bc52-65c23ba93632/oai
dc.identifier.uri http://acikerisim.sdu.edu.tr/xmlui/handle/123456789/95947
dc.description In this study, plaster stemming application at a basalt quarry was investigated. For comparison of two stemming method, test blasts were carried out in the same quarry bench. For unit volume rock, plaster stemming provided lower cost than drill cuttings stemming. Because, burden and spacing distances were increased at plaster stemming round. Although length of charge column was increased, the cost of unit volume rock was lower for plaster stemming round. Rock piles fragmentation of plaster stemming round and drill cuttings stemming round were similar.
dc.language eng
dc.rights info:eu-repo/semantics/closedAccess
dc.title Plaster Stemming Application at a Basalt Quarry: a Case Study
dc.type info:eu-repo/semantics/conferenceObject


Files in this item

Files Size Format View

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account